Site Piping Engineer
- Somerset
- Permanent
- Full-time
- To deliver the engineering required for installation of the MEH piping scope on site through leadership of a team of Engineers from delivery to site of piping/equipment through to handover to commissioning.
- To provide integration of the site scope within the wider E2E Piping Engineering team.
Operating Environment
- The current Piping Construction Engineering team size comprises of 9 Engineers, however this will grow to match the workload on site
- MEH End to End Engineering team currently comprises circa 120 engineers
- Piping Engineering team consists of circa 40 engineers
- As this is a front-line site delivery role, there is a necessity to work flexibility working under the time pressure of the schedule in order to unblock technical issues to allow continuity of work by the installation teams.
- The Site Piping Engineer will have delegation to perform decision making on site within a defined boundary to allow efficient and quick resolution of topics.
- Supporting the Contract Engineering Lead activities for HK8010 installation contract related to BNI and/or BoP piping (construction activities), in particular:
o Updating of LDRC (List of Documents Required from the Contractor) and Surveillance Plan for BNI scope
o Answering Technical Queries
o Resolving the construction Open Points
- Coordinating of the answer to Exemption Requests
- Coordination and reviewing deliverables from the Erection Contractors to support readiness of site erection activities.
- Reviewing installation specifications from the Responsible Designer (RD).
- Assistance to HK8010 Contract Engineering Lead (CEL) to update the BNI discipline LAD (List of Applicable Documents) and Works Information.
- Supporting to HK8010 Contract Engineering Lead (CEL) to manage Early Warnings.
- To handle specific technical topics and support to project managers to prepare BFPI/CMB/PCR paper, etc.
- Supporting the construction Project Managers in the establishment of Key Performance indicators with the objective of reporting site progresses for construction activities.
- Proactive reactivity and technical experience to enable site construction activities to be executed without blocker to delivery, by providing technical support/expertise to close all open points / technical queries raised by the construction contractor.
- Coordinate interface with Front Office teams in the answers provided for Field Change Requests / Non-Conformances from site.
- Ensure integration of the needs for activities post-construction (completion team) into the construction sequence (for instance: Hydro pressure test loop definition, Commissioning Test
LogicMelon